Hello,
the customer asks an automatic procedure that does these things:
1) Read the server configuration from db table (o.s., user, password, ip server, agent date scheduling etc );
2) Transfer the Agent installation on target machine
3) Run the install on server target the agent (exe file) with right scheduling
The problem is the scheduling. If We have 10 target server with 10 different scheduling (10 records from db table), how Can we create 10 different exe file with 10 different scheduling date ?
Can We create only one exe file and change after the scheduling date ?
Thanks for your support.
Andrea