I keep getting for two workstations, Failed status when pushing an agent via schedular . Result = The agent setup succeeded and is now rebooting. Return Code = 1086 Status = Failed
I am attaching the log file with this.
What is happening with this?? And why am I getting this??
Thanks
Cathy